Conducted by DOST CALABARZON
, Started on 1993 -
Completed on 2015
Ongoing
Total Page Views : 1013
Total Likes : 195
Like
A research project on the design, consultancy and technical supervision on the construction, operation, maintenance and monitoring of biogas digester. The project has provided designs for the Fixed Dome biogas digester with capacities ranging from 1 cu. m. to 150 cu. m. and orientation, seminars and trainings on biogas technology. With a construction reaching 369 units, the project has provided an accumulative fuel (LPG) savings valued at Php 14.4M (1994 - 2013).